Charging on a standard outlet gets you a handful of miles an hour. A Level 2 charger fills the battery overnight. OSB installs home and workplace EV charging across South Easton, including the load calculation your panel actually needs.
“Garage had one outlet and a light on the house circuit. Now it has a sub-panel and I can actually use my tools.”
“Two-prong outlets all through a 1920s house. They grounded what could be grounded and GFCI-protected the rest, then labelled everything.”
“Sold our house and the buyer's inspector flagged eight electrical items. OSB fixed all of them in one visit and wrote it up so we could close on time.”
A short run from a panel with free capacity is often under a thousand dollars plus the unit. Long runs, trenching, or a panel upgrade raise it. We quote flat after a quick look at your panel.
Not always. A load calculation decides it. Many South Easton homes on 200 amp service take a 48A charger without changes; older 100 amp services often need an upgrade or a load-management device.
Yes — hardwired, commissioned, and set to the right breaker size for your vehicle and panel.
Most South Easton installs are done in a few hours. Trenching to a detached garage or a same-day panel upgrade extends it to a full day.
We file it, meet the inspector, and hand you the closed permit for any rebate paperwork.
Standby and whole house backup
See serviceCKT DIAGTroubleshooting and fault finding
See serviceCKT 15ARecessed, outdoor, LED retrofit
See serviceCKT SPDPanel-mounted surge protective devices
See serviceCKT 20AGFCI, USB, dedicated circuits
See serviceCKT 24/7No power, sparks, burning smell
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
The old wiring in your attic, explained — plus what a staged rewire actually looks like.
ReadGUIDEThe decisions that cost fifty dollars during a renovation and two thousand afterwards.
ReadGUIDEThis is the one electrical symptom that should never wait until morning.
Read