Nor'easters take Chester power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“Two-prong outlets all through a 1920s house. They grounded what could be grounded and GFCI-protected the rest, then labelled everything.”
“Bought an EV and had no idea what my panel could handle. They did the load calculation, told me straight that I had room, and installed the charger two days later.”
“The quote they gave me on the phone was the number on the invoice. That is apparently rare and it shouldn't be.”
It depends on whether you want essential circuits or the whole house. A typical Chester single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Chester has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Chester.
Knob-and-tube and aluminium replacement
See serviceCKT 15ANew boxes, remotes, high ceilings
See serviceCKT SPDPanel-mounted surge protective devices
See serviceCKT 60ALevel 2 and Tesla Wall Connector
See serviceCKT CAT6Automation, structured wiring, hubs
See serviceCKT 24/7No power, sparks, burning smell
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
Spacing rules, colour temperature, and the mistake that makes a ceiling look like an airport.
ReadGUIDEThree legitimate fixes, one of which is far cheaper than a rewire.
ReadGUIDEThe decisions that cost fifty dollars during a renovation and two thousand afterwards.
Read