Nor'easters take Hingham power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“Office fit-out on a tight deadline. They worked around our contractor, hit every date, and the inspection passed first time.”
“Our panel was original to the house and completely full. OSB upgraded us to 200 amp, pulled the permit, met the inspector, and left the basement cleaner than they found it.”
“Every smart switch I bought failed because there was no neutral. They pulled neutrals in the rooms that needed it and set up the rest properly.”
It depends on whether you want essential circuits or the whole house. A typical Hingham single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Hingham has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Hingham.
Level 2 and Tesla Wall Connector
See serviceCKT 20AGFCI, USB, dedicated circuits
See serviceCKT CAT6Automation, structured wiring, hubs
See serviceCKT DIAGTroubleshooting and fault finding
See serviceCKT 24/7No power, sparks, burning smell
See serviceCKT 14/2Knob-and-tube and aluminium replacement
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
Sizing, fuel, transfer switches, and the honest answer on whether you need whole-house coverage.
ReadGUIDESpacing rules, colour temperature, and the mistake that makes a ceiling look like an airport.
ReadGUIDEThree legitimate fixes, one of which is far cheaper than a rewire.
Read