Nor'easters take Pocasset power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“Whole-house LED retrofit across our warehouse. Our lighting bill dropped and you can finally read labels on the top rack.”
“Called at 11pm when half the house went dark and an outlet was making a noise I'd never heard before. Someone was at the door in under an hour and had it isolated before midnight.”
“We had knob-and-tube in the attic and our insurer was getting nervous. They rewired in stages so we never lost power for more than a few hours at a time.”
It depends on whether you want essential circuits or the whole house. A typical Pocasset single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Pocasset has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Pocasset.
Level 2 and Tesla Wall Connector
See serviceCKT 3PHOffices, retail, restaurants, warehouse
See serviceCKT 14/2Knob-and-tube and aluminium replacement
See serviceCKT CAT6Automation, structured wiring, hubs
See serviceCKT 200A100A to 200A service, breaker boxes
See serviceCKT 15ANew boxes, remotes, high ceilings
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
The decisions that cost fifty dollars during a renovation and two thousand afterwards.
ReadGUIDEThe old wiring in your attic, explained — plus what a staged rewire actually looks like.
ReadGUIDESpacing rules, colour temperature, and the mistake that makes a ceiling look like an airport.
Read