A plain breakdown of what actually moves the number on a Massachusetts panel upgrade quote.
Panel upgrade quotes in Massachusetts vary more than almost any other electrical job, and homeowners usually can't tell why one number is double another. Almost always, the difference isn't the panel. It's everything around it.
A service upgrade is four separate pieces of work bundled into one price: the new load centre and breakers, the service entrance conductors and meter socket, the grounding electrode system, and the coordination with the utility and the local inspector. A quote that looks cheap has usually left one of those out.
Plenty of homeowners are quoted a service upgrade when what they actually need is space. If your 200 amp service is fine but the panel is physically full, a sub-panel adds capacity for a fraction of the cost. Similarly, if you're adding an EV charger and the load calculation is borderline, a load-management device can be far cheaper than a new service.
Ask three questions of any quote: does it include the permit, does it include the utility coordination, and does it include grounding upgrades if the inspector requires them. If the answer to any of those is no, the number in front of you isn't the final number.
100A to 200A service, breaker boxes
See serviceSERVICELevel 2 and Tesla Wall Connector
See serviceSERVICEPanel-mounted surge protective devices
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
What to decide before you book a Level 2 charger install — and the load calculation that decides for you.
ReadGUIDEOverload, short circuit or ground fault — each has a different cause and a different fix.
ReadGUIDEWhen repeated repairs stop being repairs and start being a symptom.
Read