What to decide before you book a Level 2 charger install — and the load calculation that decides for you.
Almost every EV owner starts on the cord that came in the boot, plugged into a wall outlet, and almost every one of them upgrades within a year. Here's what to decide before you book the install.
Level 1 is a standard 120V outlet. It adds roughly three to five miles of range per hour, which is fine if you drive twenty miles a day and never forget to plug in. Level 2 runs on 240V and adds roughly twenty to forty miles per hour, which means the car is full every morning regardless of what you did yesterday.
Before anyone quotes you, someone should calculate whether your service can carry the charger alongside everything else in the house. This is not a formality. A 200 amp service in a home without electric heat usually has plenty of headroom. A 100 amp service with an electric range and a heat pump often doesn't.
Where capacity is short, you have three options rather than one: upgrade the service, install a load-management device that throttles the charger when the house is busy, or install at a lower amperage. The second is frequently the cheapest good answer and is often skipped by installers who'd rather sell a panel.
A straightforward garage install next to the panel is a few hours. A detached garage needing a trench, or a run across the house to the far wall, is a full day. If the panel needs upgrading first, expect two days and a utility appointment.
EV charger installations are permitted work in Massachusetts. That matters beyond compliance: rebate programmes generally require the closed permit and a receipt from the installer. Keep both.
Level 2 and Tesla Wall Connector
See serviceSERVICE100A to 200A service, breaker boxes
See serviceSERVICEAutomation, structured wiring, hubs
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
When repeated repairs stop being repairs and start being a symptom.
ReadGUIDESeven questions, and what a good answer to each sounds like.
ReadGUIDEA plain breakdown of what actually moves the number on a Massachusetts panel upgrade quote.
Read