Nor'easters take Berkley power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“They rewired our restaurant kitchen overnight so we never closed a single service. That mattered more than the price, honestly.”
“Every smart switch I bought failed because there was no neutral. They pulled neutrals in the rooms that needed it and set up the rest properly.”
“The quote they gave me on the phone was the number on the invoice. That is apparently rare and it shouldn't be.”
It depends on whether you want essential circuits or the whole house. A typical Berkley single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Berkley has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Berkley.
Knob-and-tube and aluminium replacement
See serviceCKT 3PHOffices, retail, restaurants, warehouse
See serviceCKT 60ALevel 2 and Tesla Wall Connector
See serviceCKT DIAGTroubleshooting and fault finding
See serviceCKT 15ARecessed, outdoor, LED retrofit
See serviceCKT SPDPanel-mounted surge protective devices
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
Seven questions, and what a good answer to each sounds like.
ReadGUIDEThis is the one electrical symptom that should never wait until morning.
ReadGUIDEThe decisions that cost fifty dollars during a renovation and two thousand afterwards.
Read