Nor'easters take Hudson power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“Two-prong outlets all through a 1920s house. They grounded what could be grounded and GFCI-protected the rest, then labelled everything.”
“Sold our house and the buyer's inspector flagged eight electrical items. OSB fixed all of them in one visit and wrote it up so we could close on time.”
“The quote they gave me on the phone was the number on the invoice. That is apparently rare and it shouldn't be.”
It depends on whether you want essential circuits or the whole house. A typical Hudson single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Hudson has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Hudson.
GFCI, USB, dedicated circuits
See serviceCKT 15ANew boxes, remotes, high ceilings
See serviceCKT CAT6Automation, structured wiring, hubs
See serviceCKT 3PHOffices, retail, restaurants, warehouse
See serviceCKT DIAGTroubleshooting and fault finding
See serviceCKT SPDPanel-mounted surge protective devices
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
Seven questions, and what a good answer to each sounds like.
ReadGUIDEThis is the one electrical symptom that should never wait until morning.
ReadGUIDEThe decisions that cost fifty dollars during a renovation and two thousand afterwards.
Read