Nor'easters take Leverett power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“Lost a furnace board and a TV in one storm. They put a surge device on the panel and explained exactly what it does and doesn't cover.”
“Office fit-out on a tight deadline. They worked around our contractor, hit every date, and the inspection passed first time.”
“Whole-house LED retrofit across our warehouse. Our lighting bill dropped and you can finally read labels on the top rack.”
It depends on whether you want essential circuits or the whole house. A typical Leverett single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Leverett has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Leverett.
Automation, structured wiring, hubs
See serviceCKT 200A100A to 200A service, breaker boxes
See serviceCKT 15ANew boxes, remotes, high ceilings
See serviceCKT 24/7No power, sparks, burning smell
See serviceCKT 20AGFCI, USB, dedicated circuits
See serviceCKT SPDPanel-mounted surge protective devices
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
What to decide before you book a Level 2 charger install — and the load calculation that decides for you.
ReadGUIDEThree legitimate fixes, one of which is far cheaper than a rewire.
ReadGUIDEOverload, short circuit or ground fault — each has a different cause and a different fix.
Read