Nor'easters take Franklin power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“Office fit-out on a tight deadline. They worked around our contractor, hit every date, and the inspection passed first time.”
“Our panel was original to the house and completely full. OSB upgraded us to 200 amp, pulled the permit, met the inspector, and left the basement cleaner than they found it.”
“Every smart switch I bought failed because there was no neutral. They pulled neutrals in the rooms that needed it and set up the rest properly.”
It depends on whether you want essential circuits or the whole house. A typical Franklin single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Franklin has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Franklin.
Automation, structured wiring, hubs
See serviceCKT 15ARecessed, outdoor, LED retrofit
See serviceCKT 200A100A to 200A service, breaker boxes
See serviceCKT DIAGTroubleshooting and fault finding
See serviceCKT 15ANew boxes, remotes, high ceilings
See serviceCKT 60ALevel 2 and Tesla Wall Connector
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
When repeated repairs stop being repairs and start being a symptom.
ReadGUIDEWhat to decide before you book a Level 2 charger install — and the load calculation that decides for you.
ReadGUIDEThree legitimate fixes, one of which is far cheaper than a rewire.
Read