Nor'easters take Merrimac power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“They rewired our restaurant kitchen overnight so we never closed a single service. That mattered more than the price, honestly.”
“Office fit-out on a tight deadline. They worked around our contractor, hit every date, and the inspection passed first time.”
“Our panel was original to the house and completely full. OSB upgraded us to 200 amp, pulled the permit, met the inspector, and left the basement cleaner than they found it.”
It depends on whether you want essential circuits or the whole house. A typical Merrimac single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Merrimac has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Merrimac.
Recessed, outdoor, LED retrofit
See serviceCKT 3PHOffices, retail, restaurants, warehouse
See serviceCKT 200A100A to 200A service, breaker boxes
See serviceCKT 20AGFCI, USB, dedicated circuits
See serviceCKT DIAGTroubleshooting and fault finding
See serviceCKT 14/2Knob-and-tube and aluminium replacement
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
Seven questions, and what a good answer to each sounds like.
ReadGUIDEWhen repeated repairs stop being repairs and start being a symptom.
ReadGUIDEThe decisions that cost fifty dollars during a renovation and two thousand afterwards.
Read