Nor'easters take Somerset power out for days, not hours. A standby generator starts on its own, carries the circuits that matter, and shuts down when the utility returns. OSB sizes, sets and wires the whole system.
“Six recessed lights in the kitchen and a dimmer that actually works. The ceiling patch was so small I didn't need a painter.”
“Breaker had been tripping for months and two other companies just replaced parts. OSB traced it to a backstabbed outlet behind a bookcase in twenty minutes.”
“We had knob-and-tube in the attic and our insurer was getting nervous. They rewired in stages so we never lost power for more than a few hours at a time.”
It depends on whether you want essential circuits or the whole house. A typical Somerset single-family runs well on 18-24kW for whole-house coverage; essentials-only systems can be half that.
Usually one to two days of electrical work once the pad is set and the fuel line is run.
Both. Natural gas is simplest where Somerset has a service line; propane is the answer where it doesn't.
Yes — the automatic transfer switch senses the outage, starts the unit, transfers the load, and switches back when utility power is stable.
We do. Annual testing, oil and filter service, and battery replacement are all available in Somerset.
No power, sparks, burning smell
See serviceCKT 15ANew boxes, remotes, high ceilings
See serviceCKT 200A100A to 200A service, breaker boxes
See serviceCKT CAT6Automation, structured wiring, hubs
See serviceCKT 14/2Knob-and-tube and aluminium replacement
See serviceCKT 3PHOffices, retail, restaurants, warehouse
See serviceFlat pricing quoted before the work starts. Same-day and next-day slots available across Massachusetts.
One protects people. One protects buildings. They are not interchangeable.
ReadGUIDEWhen repeated repairs stop being repairs and start being a symptom.
ReadGUIDEWhat to decide before you book a Level 2 charger install — and the load calculation that decides for you.
Read